Northampton College Advanced Engineering CentreNorthampton College Advanced Engineering Centre

Investment Programme

Northampton College Advanced Engineering Centre
School students having a discussion with their teacherSchool students having a discussion with their teacher

Investment Programme

School students having a discussion with their teacher
People talking in a building under constructionPeople talking in a building under construction

Investment Programme

People talking in a building under construction
Northampton Waterside CampusNorthampton Waterside Campus

Investment Programme

Northampton Waterside Campus
A Starship Robot driving down a streetA Starship Robot driving down a street

Investment Programme

A Starship Robot driving down a street
East Northamptonshire Enterprise CentreEast Northamptonshire Enterprise Centre

Investment Programme

East Northamptonshire Enterprise Centre

Catesby Aerodynamic Research and Innovation Centre

23rd September 2019

This project will see the development of a new 1,465 square metre research and innovation centre that enables high-performance technology start-ups and early growth businesses to co-locate next to the Catesby Aerodynamic Research Facility (CARF), which allows full-scale vehicle testing in constant conditions.

The innovation centre will act as a hub for the whole site, running research and development based conferences, training courses and seminars.

The centre will have:

  • flexible lettable office space from 10 sqm to 50 sqm
  • formal and informal meeting space
  • high-end conference facilities
  • co-working space for student/graduate entrepreneurs
  • exhibition areas
  • coffee bar and reception
  • event space for up to 200 people
  • access to university services and facilities

This will be part of the new Catesby science park, where businesses that rent larger units in the area can benefit from new support and expertise provided by universities renowned for their high-performance technology research and teaching.

Funding Stream: Local Growth Fund (LGF)
LGF awarded: £2M
Total project cost: £4m
Delivery Partner: TotalSim Ltd.
Project Status: Due to complete March 2021
Projected Outputs: 2 direct jobs, 41 indirect jobs, 15 new Apprenticeships, 250 businesses assisted, 1465m2 new commercial floorspace
Website: https://www.totalsimulation.co.uk

November 2020

The Catesby Innovation Centre building is now wind and watertight, with all windows fitted.

Catesby Innovation Centre, November 2020

October 2020

September 2020

Tunnel transformation project making good progress

An exciting project to turn a disused Victorian-era railway tunnel into a state-of-the-art vehicle testing facility is moving through the gears as the finishing line grows nearer...Read the full story.

Catesby Aerodynamic Research and Innovation Centre September 2020

May 2020

The Innovation Centre building is really starting to take shape, with the steel frame and floors complete, and stairs and walls starting to be constructed.

Catesby Aerodynamic Research and Innovation Centre May 2020

March 2020

The steel structure is going up on site.

Catesby Aerodynamic Research and Innovation Centre March 2020