Northampton Waterside CampusNorthampton Waterside Campus

Investment Programme

Northampton Waterside Campus
Northampton College Advanced Engineering CentreNorthampton College Advanced Engineering Centre

Investment Programme

Northampton College Advanced Engineering Centre
School students having a discussion with their teacherSchool students having a discussion with their teacher

Investment Programme

School students having a discussion with their teacher
A Starship Robot driving down a streetA Starship Robot driving down a street

Investment Programme

A Starship Robot driving down a street
East Northamptonshire Enterprise CentreEast Northamptonshire Enterprise Centre

Investment Programme

East Northamptonshire Enterprise Centre
People talking in a building under constructionPeople talking in a building under construction

Investment Programme

People talking in a building under construction

Bedford Green Energy Innovation Park

28th January 2021

Located on a 30-ha former landfill site, this exemplar model within the Oxford-Cambridge Arc will generate green, low carbon, clean energy to encourage others to reduce carbon emissions, adopt innovative technologies, and improve air quality.

The solar array project will kick start the green energy innovation park and the work over the next four years on the site could lead to substantial training and new job opportunities in the green energy and construction sectors. The power generated will be used on site and the intention is to supply local commerce with clean energy.

Funding Stream: Getting Building Fund (GBF)
GBF Awarded: £1.8675M
Total Project Cost: £4.15M
Project Status: Completed May 2022
Projected Outputs: 30.5 jobs, 30 Ha Brownfield land brought back into use, approx. 11000 tonnes of CO2 savings

HMG logo

September 2021

• Lagoon at the top of Area 3 of southern slope was drained successfully through the onsite pump.
• Finn drain installation work completed in Area 3 of the southern slope.
• First layer of capping ongoing on Area 3 of southern slope.

May 2021

Work on capping the site is well advanced and the solar panels are due to be delivered in September 2021.