Northampton College Advanced Engineering CentreNorthampton College Advanced Engineering Centre

Investment Programme

Northampton College Advanced Engineering Centre
A Starship Robot driving down a streetA Starship Robot driving down a street

Investment Programme

A Starship Robot driving down a street
School students having a discussion with their teacherSchool students having a discussion with their teacher

Investment Programme

School students having a discussion with their teacher
People talking in a building under constructionPeople talking in a building under construction

Investment Programme

People talking in a building under construction
Northampton Waterside CampusNorthampton Waterside Campus

Investment Programme

Northampton Waterside Campus
East Northamptonshire Enterprise CentreEast Northamptonshire Enterprise Centre

Investment Programme

East Northamptonshire Enterprise Centre

Flitwick Transport Interchange

18th January 2021

This project will create a multi-modal public transport interchange at the existing Flitwick rail station.

The interchange will enable full integration across different modes of transport, deliver new passenger facilities, increase modal shifts from private vehicles to sustainable travel, support regeneration of the station area and future proof public transport.

The scheme will overcome structural challenges in the town centre (caused by the location of the rail line and station) and directly enable the redevelopment of the Flitwick Station Area for the purpose of a mixed-use commercial scheme comprising residential, leisure units and car parking.

Funding Stream: Getting Building Fund (GBF)
GBF Awarded: £2.219035M
Total Project Cost: £4.573021M
Project Status: Due to complete by end of 2022
Projected Outputs: A total of 172,800 trips shifted from road to bus, cycling (and/or walking) between 2022/23 and 2030. Reduction in kilometres driven in cars and 103 tons of carbon dioxide emission eliminated

HMG logo

April 2023

Construction was complete in December 2022 as planned and the interchange is now operational.

April 2022

Work is progressing well, with completion of the scheme forecast before the end of 2022.

 

 