People talking in a building under constructionPeople talking in a building under construction

Investment Programme

People talking in a building under construction
Northampton Waterside CampusNorthampton Waterside Campus

Investment Programme

Northampton Waterside Campus
School students having a discussion with their teacherSchool students having a discussion with their teacher

Investment Programme

School students having a discussion with their teacher
East Northamptonshire Enterprise CentreEast Northamptonshire Enterprise Centre

Investment Programme

East Northamptonshire Enterprise Centre
Northampton College Advanced Engineering CentreNorthampton College Advanced Engineering Centre

Investment Programme

Northampton College Advanced Engineering Centre
A Starship Robot driving down a streetA Starship Robot driving down a street

Investment Programme

A Starship Robot driving down a street

Modern methods of construction Bedford College

21st January 2021

This project aims to update the facilities available at The Bedford College Group and for the College to be a leader in the “Design – build – logistics – construct” field by teaching Modern Methods of Construction (MMC).

The investment will fund:

  • “curriculum for the future” for MMC that will be based around five areas - Digital Technologies, Building, Fabrication and welding, Environmental Technologies and Low Carbon: and
  • the redevelopment of the existing construction teaching facility to provide a building configured for the delivery of the new MMC curriculum.

The existing facility is a 2,345m2 condition C (poor) 1960’s workshop at the Bedford College, Cauldwell Street site, situated on a prominent arterial road approaching Bedford Town Centre.

Funding Stream: Getting Building Fund (GBF)
GBF Awarded: £2.9M
Total Project Cost: £4.3M
Project Status: Completed September 2021
Projected Outputs: Apprentices, new full time, part time and higher education learners, and employment opportunities within the college. Redevelopment of this building could begin to improve the local environment.
Website: www.bedford.ac.uk

HMG logo

September 2021

The new facility was opened in September 2021 and is in use for students.

August 2021

Topping out ceremony 

June 2021

The project is progressing and the exterior of the building is nearing completion

January 2021

Works began on site