The South East Midlands Local Enterprise Partnership has now
formally closed as a registered limited company.

To stay updated on the latest economic developments throughout the region, we encourage you to visit the South East Midlands Growth Hub. The SEM Growth Hub also provides free business advice and guidance to all businesses, manages funding and grant programmes and has an extensive resource library where businesses can find additional support.

Visit the South East Midlands Growth Hub here

You can still continue to browse the SEMLEP website, and contact
all employees using their existing email addresses.

A Starship Robot driving down a street A Starship Robot driving down a street
A Starship Robot driving down a street
People talking in a building under construction People talking in a building under construction
People talking in a building under construction
School students having a discussion with their teacher School students having a discussion with their teacher
School students having a discussion with their teacher
East Northamptonshire Enterprise Centre East Northamptonshire Enterprise Centre
East Northamptonshire Enterprise Centre
Northampton Waterside Campus Northampton Waterside Campus
Northampton Waterside Campus
Northampton College Advanced Engineering Centre Northampton College Advanced Engineering Centre
Northampton College Advanced Engineering Centre

Rookery South Energy Recovery Facility

8 August 2022

Located in a former brick clay extraction pit near Stewartby in Bedfordshire, the Rookery South Energy Recovery Facility provides a sustainable alternative to landfill and will now also provide waste heat to a new heat network. The low temperature hot water will be pumped to connected buildings via pre-insulated below ground pipework and heat interface units provided at the final connections.

The energy centre will be constructed in a modular style to facilitate future expansion for other anticipated developments in the area (potentially circa. 30MW total load). This modularity will also ensure the energy centre is suitable for adaptability to other low carbon technologies in the future. Up to 12,000 homes and non-domestic buildings could be connected to the scheme in the future.

This project was awarded £16.9m funding from the Heat Networks Investment Project (HNIP).

Your login details have been used by another user or machine. Login details can only be used once at any one time so you have therefore automatically been logged out. Please contact your sites administrator if you believe this other user or machine has unauthorised access.